Mar 29, 2024  
2020-2021 Catalog 
    
2020-2021 Catalog [ARCHIVED CATALOG]

Add to Portfolio (opens a new window)

AMTM - 120 Introduction to Piping 2


Includes equipment and fittings necessary for routing pipe from nozzle to rack to nozzle. Topics include: intro to process plant design, pipe manufacturing and fabrication, pipe assembly, valve types and applications, pump selection, and pressure vessels. The topics covered are chosen to prepare for the SPED PPD Level I Certification Exam.



Add to Portfolio (opens a new window)