Apr 19, 2024  
2020-2021 Catalog 
    
2020-2021 Catalog [ARCHIVED CATALOG]

Add to Portfolio (opens a new window)

AMTM - 121 Advanced Piping: Process Plant Layout & Design 2


Includes terminology and concepts needed for equipment layout within the process plant. This includes equipment placement, spacing and orientation. It also includes pipe routing to key equipment nozzles considering operations and maintenance. Topics include: design phases, instrumentation, heat exchangers, furnaces, and pipe racks. The topics covered are chosen to prepare for the SPED Professional Piping Designer Level III Certification Exam.

Pre-requisite(s):
AMTM 120  



Add to Portfolio (opens a new window)