|
Apr 26, 2024
|
|
|
|
CIET - 142 Surveying 3 Measure distances manually and electronically; Measure angles optically and electronically; Record/maintain detailed and accurate surveying notes; Perform traverse functions and determine adjusted positions of traverse stations; Perform field measurements and calculations for profiles and cross-sections; Determine earthwork quantities for engineering projects; Understand property surveys and the process of producing and analyzing plats; Produce topographic maps from field data; Display the interpersonal skills necessary to function in a team environment
Co-Requisite(s): MATH 125 , MATH 130 , DRFT 120 or instructor permission.
Add to Portfolio (opens a new window)
|
|